50 SKY SHADES - World aviation news

World’s largest aircraft leaves its hangar for the first time

Download: Printable PDF Date: 06 Aug 2016 16:59 (UTC) category:
Publisher:
World’s largest aircraft leaves its hangar for the first time - Events / Festivals publisher
Dana Ermolenko
Country: United Kingdom Aircraft: Airplanes
Source: Daily Mail

The world's largest aircraft, known fondly as the 'Flying Bum', left its hangar for the first time today.

The Airlander 10, which cost £25million to build over 10 years, is 92 metres long and pumped with a million cubic feet of helium.

The part-plane, part-airship left its hangar in Cardington, Bedfordshire at 4am today to commence a brief series of ground systems tests before its first flight later this month.

The world's largest aircraft made its first journey at 4am today. Originally known as the Airlander 10, it was christened Martha Gwyn in March, in honour of the wife of the company's chairman

As dawn breaks the sheer size of the plane can be seen from beyond the perimeter of the airfield at Cardington

As dawn breaks the sheer size of the plane can be seen from beyond the perimeter of the airfield at Cardington

It was a delicate operation as there was only a six metre clearance from the fin tip to the sides of the hangar doors

It was a delicate operation as there was only a six metre clearance from the fin tip to the sides of the hangar doors

It took around five minutes for the Airlander to clear the hangar and then a further 30 minutes to be towed to rest at the primary mast site.

The aircraft which, at 302ft long, is around 50ft larger than the biggest passenger jets, was first developed for the US government as a long-endurance surveillance aircraft but it fell foul of defence cutbacks.

Airlander has now formally been granted permission to conduct its first series of flight tests by both European Aviation Safety Agency and the UK Civil Aviation Authority.

The project's technical director, Mike Durham, said: 'Last week we successfully completed our final in-hangar all engines, all generators, all systems testing.

'My thanks to the whole business for getting us here. The entire team is looking forward to the final series of tests outside before taking to the skies for the first time.

The hangar doors at Cardington had to be opened to their fullest extent and even then it was a close thing to get it out

The hangar doors at Cardington had to be opened to their fullest extent and even then it was a close thing to get it out

'It was a very smooth first journey for Airlander and she behaved beautifully. We're delighted to have reached this significant milestone.' 

A number of tests still need to be conducted on the Airlander 10, christened the Martha Gwyn in April after the wife of Hybrid Air Vehicles chairman Philip Gwyn, but then the flight test program can start.

The aircraft is designed to stay airborne for up to five days at a time to fulfil a wide range of communication and survey roles, as well as carrying cargo and tourist passenger flights.


 





Recommended

500,000 fueling transactions. Zero paper. One connected network: aFuel sets new H1 2026 record

Information Design One AG, the Frankfurt-based aviation technology company behind the aFuel platform, has achieved a major operational milestone. During the first half of 2026, aFuel processed 50...

EBAA France warns of French aviation’s decline and its impact on regional economies

EBAA France, the representative body for France’s business aviation ecosystem, brings together aircraft operators, airport activities, aircraft manufacturing, maintenance, and training providers...

HondaJet APMG S upgrade package earns EASA validation

HondaJet Classic and APMG operators across the European Union can now access the latest enhancements developed for the HondaJet family following the European Union Aviation Safety Agency’s valid...

Airbus Global Services Forecast 2026-2045: a long-term industry outlook

Airbus forecasts that demand for aviation services will more than double between 2026 and 2045, exceeding US$420 billion in value. Driven by a compound annual growth rate (CAGR) of 3.8%, the sector wi...

Android Apps development in Riga, Latvia